
Working on the liner |

Working on the liner |

Discussing important details.
When is lunch?
Note the headroom in
the Pilothouse above
and in the forward portion of the lower salon
in photo to the right
|

Measuring for door to the head |

Nav station starts to take shape |

The Pilothouse inside wheel and
galley |

Looking down to dinette in lower
salon area from galley |

Wet locker; cherry with mahogany
trim |

Close up dinette and china cabinet |

Bow pulpit measured for fit |

Deck and nonskid, pilothouse windows
open
Note the wide side decks and open deck space |

Anchor locker and bow pulpit/anchor
roller |